Operator partner: Rigas Satiksme
Other stakeholder: Institute of Physical Energy
Riga
– The engineering study will consist of two separate feasibility assessments for the deployment of a HRS, one located at an existing bus depot and the other at an existing trolleybus depot. H2 supply options will also be considered with key focus on SMR production from grid-sourced natural gas or biogas from Riga City landfill site. Water electrolysis will also be considered. An industrial partner shall be appointed following a formal tendering process.