Industry Partner: Abengoa Hidrógeno
Operator partner: Empresa Municipal de Transportes de Madrid
Other stakeholder: Qi Energy
Madrid
– The engineering study will consider the installation of a HRS at C.O Fuencarral bus depot. Availability of different hydrogen production sources will be assessed with particular consideration on harnessing excess renewable generation (on-site water electrolysis), exploring options for on-site reforming (e.g. biofuels steam reforming), grid balancing services and biogas availability. A modular implementation strategy for the H2 source selected with be developed. All maintenance requirements will also be included within the study.